Construction project of Gheshlagh Stage Reservoir Dam

Geographical Location:

Gheshlagh Dam is located 15 km north of Sahneh and 60 km from Kermanshah.

Permanent term:

48 solar months

Project Description:

Gheshlag Reservoir Dam is being implemented with the aim of supplying urban water to the city of Sahneh, as well as the water needed for the agricultural land of Sahne Plain and Cham Khamal. The physical progress of the project is about 70% and the rial progress is about 98%.

This dam is of a pebble type with a clay core and 70 meters above the river bed.

The main project consists of excavating and embankment items of 3 million cubic meters, drilling and injection of consolidation and drainage of 35,000 meters long and about 40,000 cubic meters of concrete, with a reservoir capacity of about 50 million cubic meters.

The Most Important Activities:

Index Activity Description Unit Done Year 94 The Cumulative
Amount is Done
1 Excavation and excavation Cubic Meter 25,754  1,139,544
2 Run Rock fall Dam Cubic Meter 194,711 485,235
3 Clay core and strainer Cubic Meter 101,439 191,252
4 Implement the body filter Cubic Meter 29,633 43,454
5 Run the A-Zone river shell Cubic Meter 68,133 111,154
6 Rip rap and rock protector Cubic Meter 8,706 20,122
7 Underground digging Cubic Meter --- 7,000
8 Meshing Kilograms --- 3,200
9 Shuttercrime Sq. M --- 7,700
10 Drilling and injection Meters Long 8,605 69,805
11 Steelwork Kilograms 30,951 369,255
12 Formatting Sq. M 1,158 9,532
13 Preparation of concrete
and structural concrete
Cubic Meter 401 19,618
14 Preparation of concrete
and filling materials
Cubic Meter 637 12,276
15 Preparing, Bending, Cutting
and Threading Fittings
Tons --- 1,200

Project Details

Status:
Under implementation

Enginners